Cambridge North Station will create a new gateway to Cambridge and its northern fringes. The development is expected to serve over 3,000 passengers per day, and forms a key piece of Cambridgeshire’s transport infrastructure. The new station will alleviate congestion in the city centre and open up access to Cambridge Science Park and several major new developments to the north of Cambridge.

Through consultation and collaboration with Cambridgeshire County Council the Atkins design team created a piece of functional rail infrastructure, benchmarked for cost against other similar developments, which was also a piece of architecture specific to Cambridge and the high tech industries it would be helping to serve.

The passenger route through Cambridge North is clear and direct with constant views of the passenger destination. This allows the building to declutter itself of signage. Natural light is also used as part of the wayfinding strategy, with both top light and large format windows lighting key areas of the station and providing visual reminders to passengers of their route.

The station is wrapped in three equal bands of aluminium panels which have been perforated with a design derived from John Horton Conway’s “Game of Life” theories which he established while at Gonville and Caius College, Cambridge in 1970. These beautiful, delicate panels ensure passive security to ground floor glazed areas, assist with wayfinding while crossing the footbridge and allow the building to transform its appearance between day and night through sensitive backlighting.

By bringing out elements of its local history and surrounding businesses, the station is unique to Cambridge – a truly bespoke, tailored design for both client and community.

Key facts

Location:
Cambridge

Country/Region:
UK & Europe

Client:
Cambridgeshire County Council

Completion:
May 2017

Additional facts:
The new building is the first piece of redevelopment on the Chesterton Siding site, earmarked for the CB4 emerging masterplan.

RELATED SECTORS

RELATED SERVICES

RELATED PROJECTS

CONTACT

UK Europe

Ed Newman-Sanders
Technical director, Infrastructure
T: +44 207 121 3001
E: ed.newman-sanders@atkinsglobal.com

RELATED PROJECTS

  • A joint Atkins/Arup team undertook one of the largest and most important elements of the Crossrail project - the detailed design of the major twin tunnels to be bored beneath central London.

    The tunnels are 6.2m internal diameter, at depths of up to 37m. Eight TBMs were used to construct the tunnels - six Earth Pressure Balance Machines (EPB) and two Slurry Machines - to cater for differing ground conditions. The tunnels are lined with 250,000 Precast Concrete Segments. Tapered tunnel rings with 8 segments were designed to accommodate the minimum track alignment radius. The majority of the tunnel segments are steel fibre reinforced and include poly-propylene fibre for fire protection. Segment joints are designed with locating dowels to facilitate high quality build ensuring good waterproofing performance and long term durability. Curved geometry on the segment joints is included to improve performance and protect the segment. There are a total of 18 cross passages along the bored tunnels length, constructed in a variety of linings, including insitu concrete, pre cast SGI and sprayed concrete.

    Some of the most challenging conditions were faced on the central tunnels which pass beneath the two major financial districts, the City of London and Canary Wharf, where water bearing sand lenses were encountered. EPB TBMs were driven in parallel with station constructions which required TBM arrival, transit and re-launch systems to be developed.

    One of the biggest challenges of the tunnelling works under central London was protection of the vast network of existing third party utilities, tunnels, structures, railways and historical buildings. Atkins' engineers seconded into the Crossrail project have been responsible for the damage assessment and the design of mitigation to protect third party assets from settlement induced damage. The assessments were undertaken in accordance with a robust phased approach to ensure consistency with focus placed on the most sensitive structures.

    Timely resolution of concerns with stakeholders and third parties was key to securing “letters of no objection” to allow construction to progress. The extensive third party asset information assembled during the design phase was carefully managed and organised, allowing it to be integrated as a key data set into the Crossrail’s BIM system.

    Over 3,400 buildings, 640 structures (including London Underground tunnels and other rail assets) and up to 14,000 utilities (gas, sewer and water mains) have been assessed to date. As part of the project management team, our engineers continue to advise the client on all issues relating to third party asset protection, accounting for the actual works being undertaken and the ground response on site.

    Atkins was also awarded the architectural component contract for all the stations and associated structures. This award covers the design and specification of interior elements such as the wall and ceiling finishes, cladding systems, seating, lighting and wayfinding.

    Upon completion the line is expected to carry 72,000 passengers per hour through 40 stations travelling from Reading and Heathrow in the west, to Shenfield and Abbey Wood in the east.

    Architecture hub

    UK ,