Upgrading Works at Chinese Permanent Cemeteries

  • Twitter
  • Facebook
  • LinkedIn
  • Google+
  • Email
Project PDF Query Form
Name *
Company
Email *
Query
Enter keyword specified in image
Captcha

The objective of this assignment is to carry out the design of upgrading works (UGW) to improve the stability of the first batch of 20 slopes and retaining structures to meet current government safety standards at Aberdeen, Cape Collinson, Junk Bay and Tsuen Wan Chinese Permanent Cemeteries (CPC), which are under the maintenance responsibility of the Board of Management of the Chinese Permanent Cemeteries.

There are over 100 slopes and retaining structures located at four Chinese Permanent Cemeteries, which require UGW. In addition, this project also includes carrying out engineer inspections (EI), emergency inspections (EMI) and subsequent emergency works (SEW) for slopes, retaining structures and natural terrain arising from landslides or other serious incidents.

RELATED SECTORS

RELATED SERVICES

CONTACT