What key projects have you worked on?
KCRC Kowloon Southern Link, Shatin to Central Link and West Rail Projects, CEDD Central-Wan Chai Bypass Tunnel and P2 Underpass, Dubai Metro Red and Green Line, Gautrain in South Africa and various cable tunnels (by HDD/TBM/Pipe Jacking method) for CLP.
What are you currently working on?
MTRC South Island Line, West Island Line, Express Rail Link, DSD Harbour Area Treatment Scheme and Lai Chi Kok Transfer Scheme, and CLP Kai Tak cable Tunnels
What achievement are you most proud of?
To be the leader of the Tunnels and Ground Engineering Department since 2006 and increase the size of the team from 20 people to now over 45 people and since then have won major projects and reputation in the market.
What’s the most technically challenging tunnelling project you’ve worked on at Atkins, and in a few words, say why it was challenging?
Harbour Area Treatment Scheme Contract 24 is a complex tunnelling project and is designed under a fast track programme. The design needed to be adjusted from time to time to suit site geology and contractor’s methodology. It has required all our technical skill and an effective collaboration between us and the contractor (Leighton LNS JV) to deliver the project on time and to a high design standard.